Shite for the next two days
Mar. 25th, 2004 06:59 amFinish off with the rubber cutting and riveting. Grommeting can take longer, since that has to stop before 9pm each night.
E-mail/IM/Something with
staxxy and get the CD cover design worked out.
Pick up stuff from
bloodengel (CHUCK! We'll be there around 7!)
Cut, mold, and paint some new masks.
Finish off the gasmask pieces.
Get some 1/2-1" thick doweling for poles to mount heads on.
Mount the heads.
Talk more with
ajka about spinning 70171 tracks at con. potentially self-burn some stuff for other con DJ's.
Hire two more actors.
E-mail/IM/Something with
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Pick up stuff from
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Cut, mold, and paint some new masks.
Finish off the gasmask pieces.
Get some 1/2-1" thick doweling for poles to mount heads on.
Mount the heads.
Talk more with
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Hire two more actors.